IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0490 # 07 Y:1993 07 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,950 $0 Implemented
GT0490 # 08 Y:1993 08 1993 INSTALL OCCUPANCY SENSORS $2,650 $1,010 Implemented
GT0490 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,275 $87,090 Not Implemented
AS0080 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,879 $54,452 Not Implemented
AS0080 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,735 $0 Not Implemented
AS0080 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $392 $900 Not Implemented
AS0080 # 04 Y:1993 04 1993 USE HEAT PUMP FOR SPACE CONDITIONING $74,458 $335,000 Not Implemented
AS0080 # 05 Y:1993 05 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,329 $14,000 Not Implemented
AS0080 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,734 $1,000 Not Implemented
AS0080 # 07 Y:1993 07 1993 USE SYNTHETIC LUBRICANT $204 $1,080 Not Implemented
AS0080 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $176 $80 Not Implemented
AS0080 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $180 Not Implemented
MA0265 # 01 Y:1993 01 1993 COVER OPEN TANKS $7,538 $5,000 Implemented
MA0265 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,788 $12,305 Not Implemented
MA0265 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $12,420 Implemented
MA0265 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $114 $85 Not Implemented
MA0265 # 05 Y:1993 05 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $49,714 $17,787 Not Implemented
GT0489 # 01 Y:1993 01 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $0 Not Implemented
GT0489 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $1,200 Not Implemented
GT0489 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $190 $250 Not Implemented
GT0489 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $9,100 Implemented
GT0489 # 05 Y:1993 05 1993 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $580 Not Implemented
GT0489 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,290 $450 Not Implemented
OR0169 # 01 Y:1993 01 1993 MINIMIZE WATER USAGE $1,778 $286 Not Implemented
OR0169 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,622 $1,500 Not Implemented