IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0164 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18 $1,345 Not Implemented
NC0164 # 03 Y:1999 03 1999 INSTALL SKYLIGHTS $4,672 $35,090 Implemented
NC0164 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,553 $9,000 Implemented
NC0164 # 05 Y:1999 05 1999 MINIMIZE WATER USAGE $1,767 $0 Implemented
NC0164 # 06 Y:1999 06 1999 BURN WASTE OIL FOR HEAT $40,650 $30,000 Implemented
NC0164 # 07 Y:1999 07 1999 ADOPT IN-HOUSE MATERIAL GENERATION $1,975 $2,500 Implemented
UF0225 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,814 $13,400 Implemented
UF0225 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,490 $12,912 Not Implemented
UF0225 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,000 Implemented
UF0225 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $912 $0 Implemented
UF0225 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,729 $25,000 Not Implemented
UF0225 # 06 Y:1999 06 1999 RECOVER AND REUSE WASTE MATERIAL $1,825 $0 Not Implemented
UF0225 # 07 Y:1999 07 1999 $28,392 $115 Implemented
DS0140 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $1,918 $1,190 Implemented
DS0140 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,697 $6,324 Not Implemented
DS0140 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $416 $25 Not Implemented
DS0140 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $641 $60 Implemented
DS0140 # 05 Y:1999 05 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $3,003 $1,760 Not Implemented
DS0140 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $244 $0 Not Implemented
DS0140 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $70 $0 Implemented
DS0141 # 01 Y:1999 01 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,285 $24,040 Implemented
DS0141 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $4,260 $4,500 Implemented
DS0141 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,031 $700 Implemented
DS0141 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,348 $900 Implemented
DS0141 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $13,679 $32,000 Implemented