Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0455 # 05 Y:2004 | 05 | 2004 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $1,420 | $150 | Implemented |
OR0455 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,510 | $790 | Not Implemented |
UM0253 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,527 | $19,692 | Implemented |
UM0253 # 02 Y:2004 | 02 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,810 | $3,150 | Implemented |
UM0253 # 03 Y:2004 | 03 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,558 | $750 | Implemented |
UM0253 # 04 Y:2004 | 04 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,806 | $9,583 | Implemented |
UM0253 # 05 Y:2004 | 05 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,055 | $1,229 | Not Implemented |
UM0253 # 06 Y:2004 | 06 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,580 | $810 | Implemented |
UM0253 # 07 Y:2004 | 07 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $122 | $5 | Implemented |
UD0694 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $318,395 | $324,700 | Not Implemented |
UD0694 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $295,125 | $0 | Implemented |
UD0694 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $117,513 | $80,244 | Not Implemented |
UD0694 # 04 Y:2004 | 04 | 2004 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $57,990 | $114,000 | Not Implemented |
UD0694 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,763 | $51,348 | Implemented |
UD0694 # 06 Y:2004 | 06 | 2004 | REDUCE VENTILATION AIR | $18,999 | $0 | Implemented |
UD0694 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,530 | $5,780 | Implemented |
UD0694 # 08 Y:2004 | 08 | 2004 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $4,207 | $3,323 | Not Implemented |
UD0694 # 09 Y:2004 | 09 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,140 | $0 | Not Implemented |
UD0694 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $1,427 | $210 | Implemented |
UD0694 # 11 Y:2004 | 11 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $883 | $1,962 | Implemented |
UD0694 # 12 Y:2004 | 12 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $860 | $845 | Not Implemented |
UD0694 # 13 Y:2004 | 13 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $790 | $660 | Implemented |
UD0694 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $393 | $13 | Implemented |
UD0694 # 15 Y:2004 | 15 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $288 | $0 | Implemented |
WI0468 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $124,013 | $650,000 | Not Implemented |