Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2202 # 10 Y:2022 | 10 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,737 | $646,020 | Not Implemented |
OR0748 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,763 | $1,880 | Implemented |
OR0748 # 02 Y:2022 | 02 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $34,830 | $88,699 | Implemented |
OR0748 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $3,913 | $10,533 | Implemented |
OR0748 # 04 Y:2022 | 04 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $99,431 | $292,453 | Implemented |
OR0748 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,032 | $9,520 | Implemented |
NL0062 # 01 Y:2022 | 01 | 2022 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $45,354 | $242,300 | Not Implemented |
NL0062 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,581 | $24,336 | Implemented |
NL0062 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,498 | $18,517 | Implemented |
NL0062 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,413 | $660 | Implemented |
NL0062 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $1,313 | $440 | Not Implemented |
NL0062 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,261 | $918 | Not Implemented |
NL0062 # 07 Y:2022 | 07 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $424 | $50,000 | Implemented |
OK1062 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,294 | $2,732 | Implemented |
OK1062 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,554 | $0 | Implemented |
OK1062 # 03 Y:2022 | 03 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $12,930 | $48,590 | Not Implemented |
OK1062 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $101 | $580 | Implemented |
OK1062 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,957 | $30,186 | Implemented |
AM0836 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $12,100 | $11,315 | Implemented |
AM0836 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,240 | $8,070 | Implemented |
AM0836 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,850 | $890 | Implemented |
AM0836 # 04 Y:2022 | 04 | 2022 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,270 | $2,420 | Implemented |
AM0836 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $570 | $1,820 | Implemented |
AM0836 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $167 | $35 | Implemented |
LS2201 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $242 | $25 | Not Implemented |