Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0399 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $42,675 | $101,238 | Not Implemented |
SF0399 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $835 | $2,209 | Not Implemented |
SF0399 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $1,028 | $4,855 | Not Implemented |
SF0399 # 08 Y:2011 | 08 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $31,982 | $112,500 | Not Implemented |
SF0399 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,758 | $307,524 | Implemented |
SF0399 # 10 Y:2011 | 10 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,800 | $37,014 | Not Implemented |
SF0399 # 11 Y:2011 | 11 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,286 | $77,335 | Not Implemented |
SF0399 # 12 Y:2011 | 12 | 2011 | INSTALL OCCUPANCY SENSORS | $5,862 | $26,604 | Implemented |
SF0399 # 13 Y:2011 | 13 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,038 | $65,479 | Not Implemented |
SF0399 # 14 Y:2011 | 14 | 2011 | ADOPT IN-HOUSE MATERIAL GENERATION | $38,710 | $49,256 | Not Implemented |
SF0398 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,251 | $0 | Implemented |
SF0398 # 02 Y:2011 | 02 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $4,412 | $0 | Implemented |
SF0398 # 03 Y:2011 | 03 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $23,241 | $0 | Implemented |
SF0398 # 04 Y:2011 | 04 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $4,965 | $424 | Implemented |
SF0398 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $112,927 | $56,209 | Implemented |
SF0398 # 06 Y:2011 | 06 | 2011 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $136,531 | $212,500 | Not Implemented |
SF0398 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $975 | $2,405 | Implemented |
SF0398 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,046 | $25,868 | Not Implemented |
SF0398 # 09 Y:2011 | 09 | 2011 | MINIMIZE WATER USAGE | $3,872 | $1,867 | Not Implemented |
SD0508 # 01 Y:2011 | 01 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,207 | $100 | Implemented |
SD0508 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,754 | $100 | Implemented |
SD0508 # 03 Y:2011 | 03 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $2,193 | $300 | Implemented |
SD0508 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $4,354 | $1,440 | Not Implemented |
SD0508 # 05 Y:2011 | 05 | 2011 | INSTALL SET-BACK TIMERS | $1,411 | $1,000 | Implemented |
SD0508 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,218 | $46,656 | Not Implemented |