IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0257 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $356 $206 Not Implemented
SF0257 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,655 $767 Implemented
SF0257 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $7,560 $5,632 Not Implemented
SF0257 # 08 Y:2003 08 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,200 $4,171 Not Implemented
SF0257 # 09 Y:2003 09 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,339 $7,671 Not Implemented
SF0257 # 10 Y:2003 10 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,157 $4,220 Implemented
SF0257 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $801 $2,034 Not Implemented
SF0257 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,078 $12,357 Implemented
SF0257 # 13 Y:2003 13 2003 OPTIMIZE PLANT POWER FACTOR $5,601 $8,218 Not Implemented
SU0160 # 01 Y:2003 01 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $446,941 $142,000 Not Implemented
SU0160 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $158,477 $3,600 Not Implemented
SU0160 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,336,834 $875,536 Implemented
SU0160 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $16,605 $34,047 Not Implemented
SU0160 # 05 Y:2003 05 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $8,492 $4,200 Not Implemented
SU0160 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,587 $0 Not Implemented
SU0160 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $6,473 $6,375 Not Implemented
SU0160 # 08 Y:2003 08 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,145 $12,781 Not Implemented
SU0160 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,997 $3,315 Not Implemented
NC0256 # 01 Y:2003 01 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $174,891 $550,000 Not Implemented
NC0256 # 02 Y:2003 02 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $21,031 $45,000 Not Implemented
NC0256 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,507 $500 Implemented
NC0256 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,417 $12,587 Not Implemented
NC0256 # 05 Y:2003 05 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,851 $30,000 Not Implemented
NC0256 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $2,112 $4,375 Implemented
NC0256 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $123 $200 Implemented