IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0015 # 04 Y:2023 04 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $199 $360 n/a
WV0641 # 01 Y:2023 01 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $235,798 $32,000 Not Implemented
WV0641 # 02 Y:2023 02 2023 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $189,197 $575,150 Not Implemented
WV0641 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $123,784 $178,886 Not Implemented
WV0641 # 04 Y:2023 04 2023 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $42,136 $4,100 Implemented
WV0641 # 05 Y:2023 05 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $32,260 $112,625 Not Implemented
WV0641 # 06 Y:2023 06 2023 REDUCE VENTILATION AIR $16,843 $4,400 Implemented
WV0641 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,857 $5,425 Implemented
WV0641 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $917 $933 Implemented
WV0641 # 09 Y:2023 09 2023 INSULATE BARE EQUIPMENT $402 $758 Implemented
WM0198 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $19,115 $49,375 Not Implemented
WM0198 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,760 $1,950 Not Implemented
WM0198 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,477 $12,900 Not Implemented
WM0198 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $4,800 Not Implemented
WM0198 # 05 Y:2023 05 2023 AIR CONDITION ONLY SPACE NECESSARY $1,770 $0 Not Implemented
WM0198 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,580 $0 Not Implemented
WM0198 # 07 Y:2023 07 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $808 $680 Not Implemented
WM0198 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $799 $2,886 Not Implemented
WM0198 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $744 $320 Not Implemented
LE0545 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,922 $570 Implemented
LE0545 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,466 $15,150 Implemented
LE0545 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,260 $1,500 Not Implemented
LE0545 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $2,000 Implemented
LE0545 # 05 Y:2023 05 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,441 $31,059 Not Implemented
LE0545 # 06 Y:2023 06 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,790 $27,000 Not Implemented