IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0128 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,486 $7,000 Not Implemented
SU0128 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,502 $1,100 Not Implemented
SU0127 # 01 Y:2002 01 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,500 $0 Not Implemented
SU0127 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,022 $416 Not Implemented
SU0127 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $781 $125 Not Implemented
SU0127 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $574 $3,275 Not Implemented
SU0127 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $377 $0 Not Implemented
SU0127 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $115 $697 Implemented
SU0127 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $45 $158 Not Implemented
SU0126 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $195,247 $2,000,000 Not Implemented
SU0126 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $18,512 $3,152 Implemented
SU0126 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,917 $307 Implemented
SU0126 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,232 $1,710 Not Implemented
SU0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $777 $0 Not Implemented
SU0123 # 01 Y:2001 01 2001 ELIMINATE SHIFT $13,517 $0 Not Implemented
SU0123 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,968 $694 Implemented
SU0123 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,325 $7,060 Implemented
SU0123 # 04 Y:2001 04 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,800 $0 Implemented
SU0123 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $0 Implemented
SU0123 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $196 Implemented
SU0123 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $347 $117 Implemented
SU0123 # 08 Y:2001 08 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $42 $3 Implemented
SU0120 # 01 Y:2001 01 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,106 $0 Implemented
SU0120 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $2,537 $8,750 Not Implemented
SU0120 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $188 $30 Not Implemented