Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0357 # 06 Y:2005 | 06 | 2005 | INSTALL SYSTEM TO COLLECT SCRAP | $32,128 | $29,639 | Implemented |
LM0093 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,607 | $475 | Implemented |
LM0093 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,940 | $0 | Not Implemented |
LM0093 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $903 | $200 | Not Implemented |
LM0093 # 04 Y:2005 | 04 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,570 | $150 | Not Implemented |
LM0093 # 05 Y:2005 | 05 | 2005 | MODIFY WORKLOAD | $32,448 | $300 | Not Implemented |
MI0101 # 01 Y:2005 | 01 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $51,010 | $72,500 | Not Implemented |
MI0101 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,178 | $180 | Implemented |
MI0101 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,508 | $3,000 | Not Implemented |
MI0101 # 04 Y:2005 | 04 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,336 | $600 | Not Implemented |
MI0101 # 05 Y:2005 | 05 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,200 | $6,660 | Implemented |
MI0101 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,386 | $1,030 | Implemented |
MI0101 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $294 | $195 | Not Implemented |
IC0096 # 01 Y:2005 | 01 | 2005 | ADJUST BURNERS FOR EFFICIENT OPERATION | $37,627 | $38,000 | Implemented |
IC0096 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $14,724 | $46,000 | Not Implemented |
IC0096 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $23,508 | $21,704 | Implemented |
IC0096 # 04 Y:2005 | 04 | 2005 | CLOSE OFF UNNEEDED STEAM LINES | $2,614 | $952 | Implemented |
IC0096 # 05 Y:2005 | 05 | 2005 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,798 | $24,000 | Not Implemented |
IC0096 # 06 Y:2005 | 06 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,478 | $2,371 | Implemented |
IC0096 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,476 | $1,700 | Implemented |
IC0096 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $146 | $0 | Implemented |
IC0096 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,250 | $0 | Implemented |
IC0096 # 10 Y:2005 | 10 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $140 | $430 | Not Implemented |
IC0096 # 11 Y:2005 | 11 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,209 | $4,715 | Implemented |
IC0096 # 12 Y:2005 | 12 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,971 | $34,362 | Implemented |