IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0163 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,866 $25 Implemented
NC0163 # 04 Y:1999 04 1999 COVER OPEN TANKS $24,515 $21,000 Not Implemented
NC0163 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,985 $35,000 Not Implemented
NC0163 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,068 $1,000 Implemented
NC0163 # 07 Y:1999 07 1999 TREAT AND REUSE RINSE WATERS $7,389 $4,500 Implemented
NC0163 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $55,000 $14,000 Implemented
HO0201 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $736 $2,782 Not Implemented
HO0201 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $1,161 Not Implemented
HO0201 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $6,391 $1,880 Not Implemented
HO0201 # 04 Y:1999 04 1999 SHADE WINDOWS FROM SUMMER SUN $3,456 $6,000 Implemented
HO0201 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,652 $4,000 Not Implemented
HO0201 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,200 $120 Not Implemented
HO0201 # 07 Y:1999 07 1999 IMPROVE SPACE COMFORT CONDITIONING $1,000 $3,282 Implemented
KU0515 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $400 Implemented
KU0515 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $2,430 Not Implemented
KU0515 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $820 $2,540 Not Implemented
KU0515 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
KU0515 # 05 Y:1999 05 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,140 $7,830 Implemented
KU0515 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,000 $602,110 Implemented
AM0350 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $10,000 $19,540 Implemented
AM0350 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,600 $3,800 Implemented
AM0350 # 03 Y:1999 03 1999 METER WASTE WATER $5,200 $8,500 Not Implemented
AM0350 # 04 Y:1999 04 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,545 $0 Implemented
AM0350 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $1,130 $670 Implemented
AM0350 # 06 Y:1999 06 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,122 $0 Implemented