IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0021 # 04 Y:2013 04 2013 REDUCE DELIVERY SCHEDULES $732 $0 Not Implemented
WM0021 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $234 $47 Not Implemented
WM0021 # 06 Y:2013 06 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $992 $1,544 Not Implemented
WM0021 # 07 Y:2013 07 2013 USE OPTIMUM THICKNESS INSULATION $118 $325 Not Implemented
WM0021 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $170 $32 Not Implemented
WM0021 # 09 Y:2013 09 2013 INSTALL STORM WINDOWS AND DOORS $57 $16 Not Implemented
WM0021 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,982 $9,000 Not Implemented
IP0009 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,407 $0 Implemented
IP0009 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,003 $920 Implemented
IP0009 # 03 Y:2013 03 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,258 $5,693 Not Implemented
IP0009 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,967 $25,082 Implemented
IP0009 # 05 Y:2013 05 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,706 $12,000 Not Implemented
IP0009 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,547 $15,000 Not Implemented
IA0493 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112,998 $128,338 Implemented
IA0493 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,326 $2,120 Not Implemented
IA0493 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,452 $2,000 Implemented
IA0493 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,291 $105 Implemented
IA0493 # 05 Y:2013 05 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,659 $3,000 Not Implemented
IA0493 # 06 Y:2013 06 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $328 $200 Not Implemented
UD0874 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $23,112 $20,000 Not Implemented
UD0874 # 02 Y:2013 02 2013 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,400 $200 Implemented
UD0874 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,108 $38,600 Not Implemented
UD0874 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,148 $51,240 Not Implemented
UD0874 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $6,405 Not Implemented
UD0874 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $95,537 $39,093 Not Implemented