IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0103 # 07 Y:1996 07 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $192 $100 Not Implemented
NC0083 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,850 $1,578 Implemented
NC0083 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $108 $560 Implemented
NC0083 # 03 Y:1996 03 1996 USE PHOTOCELL CONTROLS $2,242 $660 Implemented
NC0083 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $859 $30 Not Implemented
NC0083 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $605 $600 Not Implemented
NC0083 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,187 $3,224 Implemented
NC0083 # 07 Y:1996 07 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,902 $600 Implemented
NC0083 # 08 Y:1996 08 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,683 $2,500 Not Implemented
NC0083 # 09 Y:1996 09 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $58,765 $10,360 Not Implemented
NC0099 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,822 $7,500 n/a
NC0099 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,237 $27,552 n/a
NC0099 # 03 Y:1996 03 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $201 $40 n/a
NC0099 # 04 Y:1996 04 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $289 $10 n/a
NC0099 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,927 $200 n/a
NC0099 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,592 $390 n/a
NC0099 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $1,600 n/a
NC0099 # 08 Y:1996 08 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,584 $66,000 n/a
NC0082 # 01 Y:1996 01 1996 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,228 $2,500 Implemented
NC0082 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,084 $3,000 Not Implemented
NC0082 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $534 $330 Not Implemented
NC0082 # 04 Y:1996 04 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,118 $100 Implemented
NC0082 # 05 Y:1996 05 1996 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $820 $200 Implemented
NC0082 # 06 Y:1996 06 1996 REDUCE VENTILATION AIR $4,208 $10,000 Not Implemented
NC0082 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $91 $80 Not Implemented