IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0449 # 06 Y:1992 06 1992 RECOVER WASTE HEAT FROM EQUIPMENT $8,056 $700 Implemented
TN0449 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,404 $700 Implemented
TN0450 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $860 Implemented
TN0450 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $788 $300 Implemented
TN0450 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $316 Implemented
TN0450 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $706 $890 Implemented
TN0450 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,058 $0 Implemented
TN0450 # 06 Y:1992 06 1992 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Implemented
MA0231 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $95,745 $229,893 Not Implemented
MA0231 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,364 $30,000 Not Implemented
MA0231 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $5,409 $2,790 Not Implemented
MA0231 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $3,499 $11,534 Not Implemented
MA0231 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36 Implemented
MA0231 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,652 $20,657 Not Implemented
MA0231 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,000 $0 Implemented
MA0231 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,209 $11,204 Not Implemented
MA0231 # 09 Y:1992 09 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $318 $740 Not Implemented
MO0046 # 01 Y:1992 01 1992 RECOVER AND REUSE COOLING WATER $6,716 $0 Not Implemented
MO0046 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,923 $586 Not Implemented
MO0046 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $270 Not Implemented
MO0046 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $3,213 $672 Not Implemented
MO0046 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $227 $1,800 Not Implemented
MO0046 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $76 $0 Not Implemented
MO0046 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,132 $1,700 Implemented
MO0046 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $376 $234 Implemented