IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0073 # 11 Y:1992 11 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,056 $2,000 Implemented
AS0074 # 01 Y:1992 01 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,393 $160,800 Not Implemented
AS0074 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,790 $568 Not Implemented
AS0074 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $515 $630 Not Implemented
AS0074 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $321 $3,168 Not Implemented
AS0074 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,552 $160 Not Implemented
AS0075 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,170 $300 Not Implemented
AS0075 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,051 $1,000 Not Implemented
AS0075 # 03 Y:1992 03 1992 IMPROVE LUBRICATION PRACTICES $845 $1,638 Not Implemented
AS0075 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,379 $9,635 Not Implemented
AS0075 # 05 Y:1992 05 1992 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,602 $1,008 Not Implemented
AS0075 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $1,860 $9,880 Not Implemented
AS0075 # 07 Y:1992 07 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,740 $9,000 Not Implemented
AS0075 # 08 Y:1992 08 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $840 $3,100 Not Implemented
AS0067 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $793 $6,684 Implemented
AS0067 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,648 $6,290 Implemented
AS0067 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,425 $82,095 Implemented
AS0067 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $1,008 Implemented
AS0067 # 05 Y:1992 05 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,625 $2,031,000 Implemented
AS0067 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $264 $280 Implemented
AS0067 # 07 Y:1992 07 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,838 $7,000 Implemented
AS0067 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,956 $19,000 Implemented
AS0067 # 09 Y:1992 09 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,518 $5,000 Implemented
AS0068 # 01 Y:1992 01 1992 KEEP LAMPS AND REFLECTORS CLEAN $39,436 $109,150 Not Implemented
AS0068 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,461 $26,270 Not Implemented