IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,521

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0576 # 08 Y:2022 08 2022 INSTALL TURBULATORS $3,726 $7,500 Not Implemented
UF0576 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,828 $2,002 Implemented
UF0576 # 10 Y:2022 10 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,400 $1,449 Implemented
UF0576 # 11 Y:2022 11 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $284,508 $0 Implemented
UF0576 # 12 Y:2022 12 2022 IMPROVE SPACE COMFORT CONDITIONING $19,893 $5,851 Implemented
KS2201 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,955 $5,480 Implemented
KS2201 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,137 $60 Implemented
KS2201 # 03 Y:2022 03 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,085 $4,460 Not Implemented
KS2201 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,082 $154,800 Implemented
KS2201 # 05 Y:2022 05 2022 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,820 $2,174 Not Implemented
KS2201 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $868 $1,047 Not Implemented
KS2201 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,572 $61,880 Implemented
KS2201 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $60,974 $540,200 Not Implemented
KS2201 # 09 Y:2022 09 2022 CHECK FOR ACCURACY OF UTILITY / POWER METERS $13,164 $120 Implemented
GT0959 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,495 $800 Implemented
GT0959 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $184 $50 Implemented
GT0959 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,641 $1,850 Implemented
GT0959 # 04 Y:2021 04 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $170 $315 Implemented
GT0959 # 05 Y:2021 05 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,169 $23,000 Not Implemented
GT0959 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $37,630 $621,000 Not Implemented
GT0958 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $93,972 $800 Implemented
GT0958 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,743 $1,850 Implemented
GT0958 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $151,488 $44,117 Not Implemented
GT0958 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $326 $200 Not Implemented
GT0958 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $368,765 $3,913,242 Not Implemented