Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,812
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2004 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $52,668 | $24,890 | Implemented |
UK2004 # 06 Y:2020 | 06 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $71,487 | $150,900 | Implemented |
UK2004 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $102,672 | $4,000 | Implemented |
UK2004 # 08 Y:2020 | 08 | 2020 | ELIMINATE A BY-PRODUCT | $293,614 | $53,800 | Not Implemented |
UK2004 # 09 Y:2020 | 09 | 2020 | OPTIMIZE PLANT POWER FACTOR | $40,258 | $23,660 | Implemented |
UK2003 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $2,200 | Not Implemented |
UK2003 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $660 | $0 | Not Implemented |
UK2003 # 03 Y:2020 | 03 | 2020 | REDUCE VENTILATION AIR | $5,372 | $4,560 | Not Implemented |
UK2003 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $4,628 | $1,586 | Implemented |
UK2003 # 05 Y:2020 | 05 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $15,645 | $28,100 | Implemented |
UK2003 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $10,287 | $6,825 | Not Implemented |
UK2003 # 07 Y:2020 | 07 | 2020 | MINIMIZE WATER USAGE | $27,840 | $15,000 | Implemented |
UK2002 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,770 | $2,473 | Implemented |
UK2002 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $473 | $160 | Implemented |
UK2002 # 03 Y:2020 | 03 | 2020 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $800 | $0 | Not Implemented |
UK2002 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $460 | $0 | Not Implemented |
UK2002 # 05 Y:2020 | 05 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $17,165 | $0 | Implemented |
UK2001 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,076 | $2,010 | Implemented |
UK2001 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,413 | $0 | Not Implemented |
UK2001 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,887 | $9,378 | Implemented |
UK2001 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $571 | $875 | Implemented |
UK2001 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,684 | $2,240 | Not Implemented |
UK2001 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $118,102 | $6,775 | Not Implemented |
UK2001 # 07 Y:2020 | 07 | 2020 | CLEAN CONDENSER TUBES | $4,023 | $8,700 | Implemented |
UK2001 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $2,547 | $1,006 | Not Implemented |