IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0025 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,388 $45,275 Implemented
NL0025 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,651 $1,575 Implemented
NL0025 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $914 $1,600 Implemented
NL0024 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,239 $33,526 Implemented
NL0024 # 02 Y:2018 02 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,242 $10,000 Not Implemented
NL0024 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $571 $0 Not Implemented
NL0024 # 04 Y:2018 04 2018 METER WASTE WATER $319 $0 Not Implemented
NL0022 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,523 $155,000 Not Implemented
NL0022 # 02 Y:2018 02 2018 INSTALL BACK-UP EQUIPMENT $4,746 $2,010 Not Implemented
NL0022 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $5,620 Implemented
NL0021 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,355 $0 Implemented
NL0021 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,774 $15,206 Implemented
NL0021 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
NL0020 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,414 $29,401 Implemented
NL0020 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $1,869 $56 Implemented
NL0020 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $543 $2,476 Not Implemented
NL0020 # 04 Y:2018 04 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $81 $200 Implemented
NL0019 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,000 $23,000 Implemented
NL0019 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,412 $32,000 Not Implemented
NL0019 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,580 $0 Implemented
NL0019 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $5,000 $6,500 Not Implemented
NL0018 # 01 Y:2018 01 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $24,300 $149,000 Not Implemented
NL0018 # 02 Y:2018 02 2018 USE OPTIMUM TEMPERATURE $9,300 $210 Implemented
NL0018 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $3,700 $2,500 Implemented
NL0018 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,100 $820 Implemented