IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1057 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,173 $0 Implemented
UD1057 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,974 $952 Implemented
UD1057 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $767 $3,117 Not Implemented
UD1057 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,676 $13,290 Implemented
UD1057 # 09 Y:2023 09 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,273 $24,175 Not Implemented
UD1057 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $7,417 $31,038 Not Implemented
UD1056 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,474 $250 Implemented
UD1056 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,573 $0 Implemented
UD1056 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,193 $0 Implemented
UD1056 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,442 $0 Implemented
UD1056 # 05 Y:2023 05 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,114 $3,100 Implemented
UD1056 # 06 Y:2023 06 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,784 $0 Implemented
UD1056 # 07 Y:2023 07 2023 REPAIR OR REPLACE STEAM TRAPS $7,938 $800 Implemented
UD1056 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,824 $0 Implemented
UD1056 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $7,204 $1,800 Implemented
UD1056 # 10 Y:2023 10 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,229 $0 Not Implemented
UD1056 # 11 Y:2023 11 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $228 $368 Implemented
UD1056 # 12 Y:2023 12 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,983 $148,109 Not Implemented
CW0127 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,576 $56,000 n/a
CW0127 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,199 $33,933 n/a
CW0127 # 03 Y:2023 03 2023 RECYCLE CASTING SAND $414,227 $38,394 n/a
CW0127 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $21,648 n/a
CW0127 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0127 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $9,906 $19,900 n/a
UD1055 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $109,446 $0 Not Implemented