IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0274 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,530 $0 Implemented
TT0274 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,507 $2,040 Not Implemented
TT0274 # 06 Y:2022 06 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,438 $1,240 Not Implemented
TT0274 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,129 $1,700 Not Implemented
TT0268 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,947 $60,000 Not Implemented
TT0268 # 02 Y:2022 02 2022 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $17,027 $10,000 Not Implemented
TT0268 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,583 $49,071 Not Implemented
TT0268 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,268 $3,480 Not Implemented
TT0268 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,223 $500 Implemented
TT0268 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,691 $2,695 Not Implemented
TT0268 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,442 $6,000 Not Implemented
TT0267 # 01 Y:2022 01 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $67,587 $45,000 Not Implemented
TT0267 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,048 $14,849 Implemented
TT0267 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,038 $18,000 Implemented
TT0267 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,631 $17,010 Implemented
TT0267 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,510 $12,000 Not Implemented
TT0267 # 06 Y:2022 06 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,445 $5,000 Not Implemented
TT0267 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,489 $1,920 Not Implemented
TT0267 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,797 $5,000 Not Implemented
TT0271 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,479 $1,500 Implemented
TT0271 # 02 Y:2022 02 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,358 $15,000 Not Implemented
TT0271 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,012 $0 Implemented
TT0271 # 04 Y:2022 04 2022 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $2,610 $12,000 Not Implemented
TT0271 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $3,000 Implemented
TT0271 # 06 Y:2022 06 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $1,316 $1,500 Implemented