IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0386 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,790 $0 Implemented
WV0386 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,379 $396 Implemented
WV0386 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,621 $1,000 Implemented
WV0386 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,548 $50 Implemented
WV0386 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $884 $1,000 Implemented
WV0386 # 13 Y:2008 13 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $0 Not Implemented
OR0540 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $2,932 $13,049 Implemented
OR0540 # 04 Y:2008 04 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $23,433 $257,380 Not Implemented
OR0540 # 05 Y:2008 05 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $434 $12,400 Not Implemented
OR0540 # 06 Y:2008 06 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,216 $0 Not Implemented
OR0540 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $699 $1,398 Not Implemented
OR0540 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $341 $0 Not Implemented
OR0540 # 01 Y:2008 01 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $29 $10,000 Implemented
OR0540 # 02 Y:2008 02 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $14,149 $6,100 Implemented
IC0149 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,460 $9,635 Implemented
IC0149 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,168 $18,015 Not Implemented
IC0149 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,470 $7,381 Implemented
IC0149 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,526 $2,040 Implemented
IC0149 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $0 Implemented
IC0149 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,594 $1,610 Implemented
IC0149 # 07 Y:2008 07 2008 UPGRADE OBSOLETE EQUIPMENT $19,706 $210 Implemented
IC0149 # 08 Y:2008 08 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $37,783 $29,280 Implemented
IC0149 # 09 Y:2008 09 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $849 $0 Implemented
IC0149 # 10 Y:2008 10 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,263 $0 Implemented
IC0149 # 11 Y:2008 11 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,626 $0 Not Implemented