Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0818 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Not Implemented |
UD0818 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $16,190 | $0 | Not Implemented |
UD0818 # 09 Y:2010 | 09 | 2010 | USE OPTIMUM TEMPERATURE | $7,200 | $0 | Implemented |
UD0818 # 10 Y:2010 | 10 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,820 | $0 | Not Implemented |
UD0818 # 11 Y:2010 | 11 | 2010 | INSTALL AUTOMATIC STACK DAMPER | $4,241 | $0 | Not Implemented |
UD0818 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Not Implemented |
UD0818 # 13 Y:2010 | 13 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,977 | $0 | Not Implemented |
UD0818 # 14 Y:2010 | 14 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $29,159 | $0 | Not Implemented |
UD0818 # 15 Y:2010 | 15 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,060 | $0 | Implemented |
UD0818 # 16 Y:2010 | 16 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,929 | $0 | Implemented |
UD0816 # 13 Y:2010 | 13 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,524 | $0 | Not Implemented |
UD0816 # 14 Y:2010 | 14 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $10,027 | $0 | Not Implemented |
UD0816 # 15 Y:2010 | 15 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,123 | $0 | Not Implemented |
UD0816 # 16 Y:2010 | 16 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $766 | $0 | Not Implemented |
UD0816 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $2,978 | $0 | Not Implemented |
UD0816 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,468 | $0 | Implemented |
UD0816 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,881 | $0 | Implemented |
UD0816 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,929 | $0 | Implemented |
UD0816 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,108 | $0 | Implemented |
UD0816 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $22,144 | $0 | Implemented |
UD0816 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $346 | $0 | Not Implemented |
UD0816 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $6,179 | $0 | Not Implemented |
UD0816 # 09 Y:2010 | 09 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,412 | $0 | Implemented |
UD0816 # 10 Y:2010 | 10 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,601 | $0 | Not Implemented |
UD0816 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,426 | $0 | Implemented |