IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0157 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,858 $6,500 Not Implemented
LE0157 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,513 $0 Not Implemented
LE0157 # 06 Y:2003 06 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $769 $200 Not Implemented
LE0154 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
LE0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Not Implemented
LE0154 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,519 $3,000 Implemented
LE0154 # 04 Y:2003 04 2003 INSULATE FEEDWATER TANK $363 $183 Not Implemented
LE0154 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $5,016 $2,582 Not Implemented
LE0154 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,485 $750 Implemented
LE0154 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $83 $150 Not Implemented
LE0144 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,579 $1,000 Not Implemented
LE0144 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,456 $0 Not Implemented
LE0144 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,820 $9,600 Not Implemented
LE0144 # 04 Y:2002 04 2002 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $968 $0 Not Implemented
LE0144 # 05 Y:2002 05 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $636 $0 Not Implemented
WV0262 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $1,233 $659 Implemented
WV0262 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,173 $3,000 Not Implemented
WV0262 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,048 $1,000 Implemented
WV0262 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $339 $0 Not Implemented
WV0262 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,273 $0 Implemented
WV0262 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,584 $0 Implemented
WV0262 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,748 $240 Not Implemented
WV0262 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $786 $0 Implemented
WV0262 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $0 Implemented
WV0262 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $4,080 Implemented