IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,197

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0311 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $844 $140 Not Implemented
SJ0023 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,134 $146,494 n/a
SJ0023 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $848 $2,144 n/a
SJ0023 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,478 $305 n/a
SJ0023 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $2,466 n/a
SJ0023 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,164 $1,874 n/a
SJ0023 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $0 n/a
SJ0023 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $190 $380 n/a
WV0666 # 01 Y:2024 01 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,346 $19,500 Not Implemented
WV0666 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $5,920 Not Implemented
WV0666 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $859 $3,565 Implemented
WV0666 # 04 Y:2024 04 2024 DEVELOP A REPAIR/REPLACE POLICY $445 $1,367 Implemented
WV0666 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $260 $640 Implemented
WV0666 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $84 $100 Implemented
LS0724 # 01 Y:2024 01 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $9,288 $0 Implemented
LS0724 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $26,997 $750 Implemented
LS0724 # 03 Y:2024 03 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,836 $4,158 Not Implemented
LS0724 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,578 $20,143 Implemented
LS0724 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,082 $3,400 Not Implemented
OK1122 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,216 $0 Implemented
OK1122 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $1,369 $1,999 Not Implemented
OK1122 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,248 $6,134 Implemented
OK1122 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,075 $1,480 Not Implemented
OK1122 # 05 Y:2024 05 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,883 $5,538 Not Implemented
OK1122 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,929 $600 Implemented