IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0294 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,603 $14,749 Implemented
UF0294 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $0 Implemented
UF0294 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $3,038 $820 Not Implemented
UF0294 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $4,538 $20,450 Not Implemented
UF0294 # 07 Y:2002 07 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,139 $18,574 Not Implemented
UF0294 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $8,307 $2,282 Not Implemented
UF0294 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,700 $7,000 Implemented
UF0294 # 10 Y:2002 10 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $8,320 $32,000 Implemented
UF0294 # 11 Y:2002 11 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,880 $13,500 Not Implemented
SU0133 # 01 Y:2002 01 2002 CHECK FOR ACCURACY OF UTILITY / POWER METERS $482 $0 Not Implemented
SU0133 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,025 $0 Implemented
SU0133 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $339 $115 Implemented
SU0133 # 04 Y:2002 04 2002 REPAIR AND ELIMINATE STEAM LEAKS $675 $87 Implemented
SU0133 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $754 $322 Implemented
SU0133 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $1,110 $264 Implemented
SU0133 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $2,774 $495 Implemented
SU0133 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $123 $60 Implemented
SU0133 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $314 $460 Not Implemented
SU0133 # 10 Y:2002 10 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14 $0 Implemented
SU0133 # 11 Y:2002 11 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,402 $13,000 Not Implemented
SU0133 # 12 Y:2002 12 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,870 $4,230 Not Implemented
AM0411 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,800 $0 Implemented
AM0411 # 02 Y:2002 02 2002 PAY UTILITY BILLS ON TIME $6,350 $0 Implemented
AM0411 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,140 $33,400 Implemented
AM0411 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,680 $340 Implemented