IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0644 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $456,074 $95,650 Not Implemented
OR0644 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $122,402 $38,517 Not Implemented
OR0644 # 03 Y:2015 03 2015 ELIMINATE/REDUCE AN OPERATION $106,634 $72,750 Implemented
OR0644 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $37,274 $20,400 Implemented
OR0644 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,431 $1,600 Not Implemented
OR0644 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $3,865 Implemented
BS0048 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,298 $28,509 Implemented
BS0048 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,926 $9,550 Implemented
BS0048 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,403 $5,220 Implemented
BS0048 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,240 $1,650 Not Implemented
BS0048 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $181 $540 Not Implemented
BS0048 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $1,969 $3,083 Implemented
BS0048 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $965 $175 Implemented
BS0048 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $168 $805 Implemented
BS0048 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $722 Implemented
BS0048 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $20 Not Implemented
UM0453 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,380 $5,000 Not Implemented
UM0453 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,831 $1,000 Implemented
UM0453 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,442 $1,500 Implemented
UM0453 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,115 $5,400 Not Implemented
UM0453 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,852 $4,000 Implemented
UD0919 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,757 $0 Implemented
UD0919 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,792 $0 Implemented
UD0919 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,936 $50 Implemented
UD0919 # 04 Y:2015 04 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,266 $9,200 Implemented