Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0257 # 10 Y:2003 | 10 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,961 | $101,667 | Not Implemented |
WV0257 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,974 | $6,300 | Implemented |
WV0257 # 12 Y:2003 | 12 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $19,542 | $1,375 | Implemented |
WV0257 # 13 Y:2003 | 13 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $538 | $2,900 | Implemented |
WV0257 # 14 Y:2003 | 14 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $954 | $110 | Implemented |
LE0148 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $567 | $1,000 | Not Implemented |
LE0148 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $0 | Implemented |
LE0148 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $300 | Implemented |
LE0148 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $692 | $0 | Not Implemented |
LE0148 # 05 Y:2002 | 05 | 2002 | INSULATE FEEDWATER TANK | $121 | $260 | Implemented |
LE0148 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,804 | $535 | Not Implemented |
LE0148 # 07 Y:2002 | 07 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,390 | $0 | Not Implemented |
LE0148 # 08 Y:2002 | 08 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,496 | $0 | Not Implemented |
LE0148 # 09 Y:2002 | 09 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,033 | $750 | Implemented |
LE0148 # 10 Y:2002 | 10 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,308 | $990 | Implemented |
LE0148 # 11 Y:2002 | 11 | 2002 | INSTALL OCCUPANCY SENSORS | $210 | $150 | Not Implemented |
LE0148 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $4,095 | Implemented |
LE0147 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,429 | $900 | Implemented |
LE0147 # 02 Y:2002 | 02 | 2002 | REPAIR OR REPLACE STEAM TRAPS | $6,177 | $4,200 | Implemented |
LE0147 # 03 Y:2002 | 03 | 2002 | COMBINE UTILITY METERS | $30,000 | $1,000 | Not Implemented |
LE0147 # 04 Y:2002 | 04 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,478 | $750 | Implemented |
LE0147 # 05 Y:2002 | 05 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,219 | $13,000 | Not Implemented |
LE0147 # 06 Y:2002 | 06 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $19,000 | $38,000 | Not Implemented |
LE0146 # 01 Y:2002 | 01 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,029 | $3,500 | Not Implemented |
LE0146 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,559 | $3,000 | Implemented |