IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0289 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,381 $11,000 Not Implemented
SD0289 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,500 $11,000 Not Implemented
SD0289 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $300 Implemented
SD0289 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,066 $800 Not Implemented
SD0289 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,045 $65,000 Not Implemented
SD0289 # 08 Y:2002 08 2002 RECOVER AND REUSE WASTE MATERIAL $13,200 $20,000 Not Implemented
SD0289 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,600 $1,500 Not Implemented
SD0289 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $40,040 $0 Not Implemented
SD0289 # 11 Y:2002 11 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $33,600 $1,600 Not Implemented
SD0289 # 12 Y:2002 12 2002 PAY UTILITY BILLS ON TIME $1,554 $0 Not Implemented
MI0029 # 01 Y:2002 01 2002 METER WASTE WATER $73,069 $3,650 Not Implemented
MI0029 # 02 Y:2002 02 2002 $55,380 $42,432 Not Implemented
MI0029 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,287 $1,550 Implemented
MI0029 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,657 $2,122 Implemented
MI0029 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,668 $3 Implemented
MI0028 # 01 Y:2002 01 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $61,673 $3,000 n/a
MI0028 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,305 $930 n/a
MI0028 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,032 $255 n/a
MI0028 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,051 $8 n/a
MI0028 # 05 Y:2002 05 2002 RECYCLE WHITE WATER $5,465 $601 n/a
MI0028 # 06 Y:2002 06 2002 COVER OPEN TANKS $149 $48 n/a
WV0235 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,241 $1,875 Implemented
WV0235 # 02 Y:2002 02 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,124 $525 Implemented
WV0235 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,006 $3,100 Implemented
WV0235 # 04 Y:2002 04 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,017 $750 Implemented