IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0262 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,748 $240 Not Implemented
WV0262 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $786 $0 Implemented
WV0262 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $0 Implemented
WV0262 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $4,080 Implemented
WV0262 # 11 Y:2003 11 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,878 $160 Not Implemented
WV0262 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,116 $0 Implemented
WV0262 # 13 Y:2003 13 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $676 $300 Implemented
WV0262 # 14 Y:2003 14 2003 REPAIR OR REPLACE STEAM TRAPS $3,018 $1,000 Implemented
WV0262 # 15 Y:2003 15 2003 MINIMIZE WATER USAGE $33,252 $9,000 Not Implemented
UU0041 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,352 $2,000 n/a
UU0041 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,207 $3,500 n/a
UU0041 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $1,080 $950 n/a
UU0041 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $31,340 $45,900 n/a
UU0041 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,860 $0 n/a
UU0041 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $748 $0 n/a
IC0056 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,010 $16,443 Not Implemented
IC0056 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,363 $23,600 Not Implemented
IC0056 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $949 $3,982 Not Implemented
IC0056 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,063 $400 Not Implemented
IC0056 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,571 $5,107 Not Implemented
IC0056 # 06 Y:2003 06 2003 REPAIR AND ELIMINATE STEAM LEAKS $17,396 $3,500 Not Implemented
IC0056 # 07 Y:2003 07 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,043 $3,000 Not Implemented
IC0056 # 08 Y:2003 08 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $3,180 $4,206 Not Implemented
IC0056 # 09 Y:2003 09 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,770 $2,052 Not Implemented
IC0056 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $2,293 $683 Not Implemented