IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0486 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $802 $857 Implemented
SU0486 # 08 Y:2019 08 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $411 $839 Implemented
SU0486 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $767 $2,060 Not Implemented
UF0535 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,230 $127,650 Implemented
UF0535 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,527 $0 Implemented
UF0535 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $3,486 $3,283 Implemented
UF0535 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,073 $2,563 Implemented
UF0535 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,330 $6,000 Implemented
UF0535 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,344 $1,400 Implemented
SF0544 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
SF0544 # 02 Y:2019 02 2019 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $1,610 $2,208 Implemented
SF0544 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,026 $11,278 Not Implemented
SF0544 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,820 $9,188 Implemented
SF0544 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $249,622 $1,187,556 Implemented
IC0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,226 $7,471 Implemented
IC0221 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,682 $4,200 Implemented
IC0221 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $8,629 $5,550 Not Implemented
OK1015 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,383 $12,752 Not Implemented
OK1015 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,577 $17,500 Not Implemented
OK1015 # 03 Y:2019 03 2019 INSTALL SET-BACK TIMERS $320 $200 Implemented
OK1015 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $435 Not Implemented
OK1015 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $2,045 Implemented
SU0485 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,025 $0 Not Implemented
SU0485 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,064 $264 Implemented
SU0485 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $344 $75 Not Implemented