Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0060 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $273 | $5,904 | Not Implemented |
AS0060 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $486 | $750 | Not Implemented |
AS0060 # 07 Y:1992 | 07 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,703 | $700 | Not Implemented |
AS0060 # 08 Y:1992 | 08 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $442 | $2,036 | Not Implemented |
AS0060 # 09 Y:1992 | 09 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $300 | Not Implemented |
AS0060 # 10 Y:1992 | 10 | 1992 | IMPROVE LUBRICATION PRACTICES | $479 | $546 | Not Implemented |
AS0061 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,012 | $24,872 | Implemented |
AS0061 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $345,320 | $530,000 | Implemented |
AS0061 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,583 | $8,109 | Implemented |
AS0061 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,446 | $3,248 | Implemented |
AS0061 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,462 | $7,288 | Implemented |
AS0061 # 06 Y:1992 | 06 | 1992 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $236,795 | $750,000 | Implemented |
AS0061 # 07 Y:1992 | 07 | 1992 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $107,027 | $6,700 | Implemented |
AS0061 # 08 Y:1992 | 08 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $129,176 | $640,000 | Implemented |
AS0061 # 09 Y:1992 | 09 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,933 | $2,000 | Implemented |
AS0062 # 01 Y:1992 | 01 | 1992 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,190 | $800 | Implemented |
AS0062 # 02 Y:1992 | 02 | 1992 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,689 | $8,870 | Implemented |
AS0062 # 03 Y:1992 | 03 | 1992 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $222 | $320 | Implemented |
AS0062 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $469 | $1,293 | Implemented |
AS0062 # 05 Y:1992 | 05 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $100 | $606 | Implemented |
AS0062 # 06 Y:1992 | 06 | 1992 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,458 | $25,000 | Implemented |
AS0062 # 07 Y:1992 | 07 | 1992 | INSULATE BARE EQUIPMENT | $607 | $183 | Implemented |
AS0062 # 08 Y:1992 | 08 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $636 | $100 | Implemented |
AS0063 # 01 Y:1992 | 01 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,891 | $70,000 | Not Implemented |
AS0063 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,159 | $2,365 | Not Implemented |