Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0165 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,152 | $14,840 | n/a |
SF0165 # 03 Y:1999 | 03 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $491 | $1,250 | n/a |
SF0165 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,333 | $51,850 | n/a |
SF0165 # 05 Y:1999 | 05 | 1999 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $726 | $0 | n/a |
SF0165 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $30,000 | $2,773 | n/a |
OK0574 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,785 | $300 | Implemented |
OK0574 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,381 | $2,100 | Implemented |
OK0574 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $934 | $1,524 | Not Implemented |
OK0574 # 04 Y:1999 | 04 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $129,375 | $0 | Implemented |
OK0574 # 05 Y:1999 | 05 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $6,000 | $0 | Not Implemented |
OK0574 # 06 Y:1999 | 06 | 1999 | BURN WASTE OIL FOR HEAT | $6,148 | $10,470 | Not Implemented |
MO0252 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $101,434 | $15,624 | Implemented |
MO0252 # 02 Y:1999 | 02 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,875 | $10,000 | Implemented |
MO0252 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $422 | $34 | Implemented |
MO0252 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,134 | $4,647 | Not Implemented |
MO0252 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,315 | $53 | Not Implemented |
MO0252 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,006 | $40 | Not Implemented |
MO0252 # 07 Y:1999 | 07 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,877 | $4,372 | Implemented |
MO0252 # 08 Y:1999 | 08 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,674 | $3,340 | Implemented |
WI0345 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $78,000 | $35,000 | Not Implemented |
WI0345 # 02 Y:1999 | 02 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $21,791 | $22,000 | Not Implemented |
WI0345 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,973 | $0 | Not Implemented |
WI0345 # 04 Y:1999 | 04 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $8,207 | $500 | Implemented |
WI0345 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,553 | $2,000 | Not Implemented |
WI0345 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,669 | $740 | Not Implemented |