IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0484 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,560 $360 Implemented
AM0484 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,000 $20 Implemented
AM0484 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $600 $0 Implemented
AM0484 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $410 $470 Not Implemented
AM0484 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $400 Implemented
UF0357 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,460 $65,755 Implemented
UF0357 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $1,105 Implemented
UF0357 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,371 $1,560 Implemented
UF0357 # 04 Y:2005 04 2005 ADD AREA LIGHTING SWITCHES $571 $2,910 Not Implemented
UF0357 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $448 $0 Implemented
UF0357 # 06 Y:2005 06 2005 RECYCLE FLUORESCENT LAMPS $1,424 $3,496 Implemented
WI0486 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,351 $18,000 Not Implemented
WI0486 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,915 $1,280 Implemented
WI0486 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,600 $7,840 Not Implemented
WI0486 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $0 Implemented
WI0486 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,086 $780 Implemented
WI0486 # 06 Y:2005 06 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,509 $700 Not Implemented
WI0486 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $671 $300 Not Implemented
WI0486 # 08 Y:2005 08 2005 INSTALL TIMERS AND/OR THERMOSTATS $453 $800 Implemented
WV0309 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $9,618 $1,147 Implemented
WV0309 # 02 Y:2005 02 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,338 $550 Implemented
WV0309 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,461 $760 Implemented
WV0309 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,239 $8,590 Implemented
WV0309 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,140 $98 Implemented
WV0309 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,646 $232 Implemented