Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0309 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,551 | $19 | Implemented |
WV0309 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,334 | $1,436 | Not Implemented |
WV0309 # 09 Y:2005 | 09 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,138 | $0 | Implemented |
WV0309 # 10 Y:2005 | 10 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,066 | $507 | Implemented |
WV0309 # 11 Y:2005 | 11 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,012 | $133 | Implemented |
WV0309 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $512 | $480 | Not Implemented |
WV0309 # 13 Y:2005 | 13 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $374 | $0 | Not Implemented |
WV0309 # 14 Y:2005 | 14 | 2005 | RECOVER AND REUSE COOLING WATER | $12,688 | $5,135 | Not Implemented |
UM0276 # 01 Y:2005 | 01 | 2005 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $206,100 | $96,000 | Implemented |
UM0276 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,572 | $2,500 | Implemented |
UM0276 # 03 Y:2005 | 03 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $663,486 | $7,500,000 | Not Implemented |
SF0301 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,466 | $0 | Not Implemented |
SF0301 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $0 | Not Implemented |
SF0301 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $819 | $0 | Not Implemented |
SF0301 # 04 Y:2005 | 04 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $11,812 | $1,220 | Not Implemented |
SF0301 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $524 | $492 | Not Implemented |
SF0301 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,905 | $2,148 | Not Implemented |
SF0301 # 07 Y:2005 | 07 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $738 | $1,086 | Not Implemented |
SF0301 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,296 | $3,276 | Not Implemented |
SF0301 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,705 | $17,952 | Not Implemented |
LM0091 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $709 | $300 | Implemented |
LM0091 # 02 Y:2005 | 02 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,029 | $683 | Implemented |
LM0091 # 03 Y:2005 | 03 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $764 | $240 | Implemented |
LM0091 # 04 Y:2005 | 04 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $28,000 | $1,260 | Not Implemented |
LM0091 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $8,750 | $200 | Implemented |