Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0646 # 15 Y:2024 | 15 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,333 | $13,388 | Not Implemented |
UU0239 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $21,184 | $8,000 | Implemented |
UU0239 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $18,178 | $2,000 | Implemented |
UU0239 # 03 Y:2024 | 03 | 2024 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $9,905 | $9,905 | Implemented |
UU0239 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $6,144 | $7,887 | Implemented |
UU0239 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,050 | $1,400 | Not Implemented |
UU0239 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,011 | $3,011 | Not Implemented |
AM0897 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,420 | $45,905 | n/a |
AM0897 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,400 | $32,265 | n/a |
AM0897 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,060 | $4,860 | n/a |
AM0897 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $520 | $102 | n/a |
AM0897 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $620 | $0 | n/a |
AM0897 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $460 | $98 | n/a |
AM0897 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $300 | $22 | n/a |
AM0897 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $100 | n/a |
AM0894 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $500 | n/a |
AM0894 # 02 Y:2024 | 02 | 2024 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $735 | $1,300 | n/a |
AM0894 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $670 | $790 | n/a |
AM0894 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $420 | $7 | n/a |
AM0894 # 05 Y:2024 | 05 | 2024 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $335 | $0 | n/a |
AM0894 # 06 Y:2024 | 06 | 2024 | USE SYNTHETIC LUBRICANT | $150 | $100 | n/a |
AM0894 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $110 | $55 | n/a |
UD1070 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $5,413 | $1,000 | Implemented |
UD1070 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,179 | $2,000 | Implemented |
UD1070 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,744 | $0 | Not Implemented |