IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0112 # 03 Y:2006 03 2006 INSTALL AUTOMATIC PACKING EQUIPMENT $4,082 $7,614 Not Implemented
TA0112 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $730 $755 Not Implemented
TA0112 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $17,967 $1,359 Not Implemented
AM0504 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,000 $1,000 Not Implemented
AM0504 # 02 Y:2006 02 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,400 $7,650 Not Implemented
AM0504 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $1,155 $0 Not Implemented
AM0504 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $686 $0 Not Implemented
AM0504 # 05 Y:2006 05 2006 REUSE / RECYCLE/ SELL PAPER PRODUCTS $455 $0 Not Implemented
AM0504 # 06 Y:2006 06 2006 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $420 $0 Not Implemented
AM0504 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $165 $0 Not Implemented
AM0503 # 01 Y:2006 01 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $16,230 $33,000 Not Implemented
AM0503 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $500 Implemented
AM0503 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $6,550 $17,100 Not Implemented
AM0503 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $300 Implemented
AM0503 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $27 Implemented
AM0503 # 06 Y:2006 06 2006 REUSE RAGS UNTIL COMPLETELY SOILED $880 $0 Not Implemented
AM0503 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $256 $0 Not Implemented
AM0502 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $288,000 $675,000 Implemented
AM0502 # 02 Y:2006 02 2006 REUSE RAGS UNTIL COMPLETELY SOILED $82,500 $0 Implemented
AM0502 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,000 $6,000 Implemented
AM0502 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $29,100 $15,000 Implemented
AM0502 # 05 Y:2006 05 2006 MODIFY WORKLOAD $25,000 $25,000 Not Implemented
AM0502 # 06 Y:2006 06 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,983 $0 Implemented
AM0502 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,650 $15 Not Implemented
AM0502 # 08 Y:2006 08 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,900 $1,000 Implemented