IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0613 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $9,100 $4,700 Implemented
GT0613 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,120,440 $1,500,000 Not Implemented
AR0114 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,260 $2,130 Not Implemented
AR0114 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,221 $2,950 Implemented
AR0114 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $226 $0 Implemented
AR0114 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,191 $290 Implemented
AR0114 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $450 Implemented
AR0114 # 06 Y:1997 06 1997 REPAIR AND ELIMINATE STEAM LEAKS $885 $180 Implemented
AR0114 # 07 Y:1997 07 1997 OPTIMIZE PLANT POWER FACTOR $21,464 $15,300 Implemented
AR0114 # 08 Y:1997 08 1997 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $286 $0 Not Implemented
AR0114 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,429 $0 Implemented
AR0114 # 10 Y:1997 10 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $677 $0 Implemented
AR0114 # 11 Y:1997 11 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $36,000 $60,000 Not Implemented
AR0114 # 12 Y:1997 12 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $72,000 $67,500 Implemented
AS0202 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,012 $11,499 Implemented
AS0202 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,445 $8,160 Not Implemented
AS0202 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,839 $12 Implemented
AS0202 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,907 $3,500 Not Implemented
AS0202 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,182 $3,000 Implemented
AS0202 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,084 $9,599 Implemented
AS0202 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $766 $1,350 Not Implemented
AS0202 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,753 $0 Not Implemented
AS0202 # 09 Y:1997 09 1997 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $665 $0 Implemented
AS0202 # 10 Y:1997 10 1997 TREAT AND REUSE RINSE WATERS $940 $500 Implemented
AS0202 # 11 Y:1997 11 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,407 $200 Not Implemented