IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0318 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,807 $24,950 Implemented
UF0318 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,439 $2,619 Not Implemented
UF0318 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,202 $0 Implemented
UF0318 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,117 $852 Not Implemented
UF0318 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,077 $16,791 Not Implemented
UF0318 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,449 $0 Implemented
UF0318 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,037 $13,339 Implemented
UF0318 # 10 Y:2003 10 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,364 $2,358 Not Implemented
UF0318 # 11 Y:2003 11 2003 MAINTAIN MACHINES TO REDUCE LEAKS $77,760 $14,000 Implemented
UF0318 # 12 Y:2003 12 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,000 $8,200 Implemented
LL0154 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $18,488,939 $413,700 n/a
AS0348 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $164 $101 Implemented
AS0348 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,361 $16,680 Implemented
AS0348 # 03 Y:2003 03 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,000 $15,500 Not Implemented
AS0348 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,021 $450 Implemented
AS0348 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $413 $2,000 Implemented
AS0348 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $93,399 $45,312 Not Implemented
LL0154 # 02 Y:2003 02 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $11,340,034 $773,535 n/a
LL0154 # 03 Y:2003 03 2003 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $6,313,507 $750,000 Not Implemented
LL0154 # 04 Y:2003 04 2003 REDUCE EXCESS STEAM BLEEDING $504,716 $45,360 Not Implemented
LL0154 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $109,742 $60,716 Implemented
LL0154 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $36,675 $4,100 Not Implemented
LL0154 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $11,082 $2,865 Not Implemented
SU0159 # 01 Y:2003 01 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,869 $18,122 Not Implemented
SU0159 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,575 $15,750 Not Implemented