IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,865

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0412 # 06 Y:2009 06 2009 INSTALL SKYLIGHTS $3,365 $9,170 Implemented
SF0369 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $70 Implemented
SF0369 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $565 $60 Implemented
SF0369 # 03 Y:2009 03 2009 UPGRADE CONTROLS ON COMPRESSORS $15,017 $14,000 Implemented
SF0369 # 04 Y:2009 04 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $34,213 $37,500 Implemented
SF0369 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,866 $26,548 Not Implemented
SF0369 # 06 Y:2009 06 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,751 $3,312 Not Implemented
SF0369 # 07 Y:2009 07 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $328 $1,039 Not Implemented
SF0369 # 08 Y:2009 08 2009 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,253 $41,149 Not Implemented
SD0411 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,081 $28,585 Not Implemented
SD0411 # 02 Y:2008 02 2008 USE PHOTOCELL CONTROLS $5,157 $4,950 Not Implemented
SD0411 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,238 $2,428 Not Implemented
SD0411 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,111 $6,578 Not Implemented
SD0411 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,030 $3,394 Not Implemented
SD0411 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $92 $200 Not Implemented
SF0368 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,195 $0 Implemented
SF0368 # 02 Y:2008 02 2008 USE PHOTOCELL CONTROLS $1,238 $786 Not Implemented
SF0368 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $666 $584 Not Implemented
SF0368 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,838 $2,773 Not Implemented
SF0368 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $200 Not Implemented
SF0368 # 06 Y:2008 06 2008 USE PHOTOCELL CONTROLS $1,435 $2,319 Not Implemented
SF0368 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $781 $1,851 Not Implemented
SF0368 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,812 $56,073 Implemented
SF0368 # 09 Y:2008 09 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $88,956 $1,020,250 Not Implemented
SD0410 # 01 Y:2008 01 2008 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $824,374 $6,360,000 Not Implemented