IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0224 # 06 Y:1999 06 1999 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $50,698 $22,390 Implemented
UF0224 # 07 Y:1999 07 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,620 $2,990 Not Implemented
HO0200 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,818 $7,776 Implemented
HO0200 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,223 $3,065 Implemented
HO0200 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $944 $1,500 Not Implemented
HO0200 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $451 $100 Not Implemented
HO0200 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,395 $4,800 Implemented
HO0200 # 06 Y:1999 06 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,628 $8,000 Not Implemented
HO0200 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $25,402 $22,000 Not Implemented
HO0200 # 08 Y:1999 08 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $10,000 $35,000 Not Implemented
CO0435 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,870 $14,850 Not Implemented
CO0435 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,380 $2,000 Implemented
CO0435 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $570 $710 Not Implemented
CO0435 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $370 $500 Implemented
CO0435 # 05 Y:1999 05 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $310 $100 Implemented
CO0435 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $210 $134 Implemented
CO0435 # 07 Y:1999 07 1999 MODIFY STARTUP/SHUTDOWN TIMES $10,920 $0 Not Implemented
CO0435 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,640 $8,000 Not Implemented
ME0264 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,149 $1,000 Implemented
ME0264 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,088 $2,500 Not Implemented
ME0264 # 03 Y:1999 03 1999 USE OPTIMUM THICKNESS INSULATION $3,286 $613 Not Implemented
ME0264 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,025 $4,646 Not Implemented
ME0264 # 05 Y:1999 05 1999 CHANGE OPERATING CONDITIONS $2,720 $950 Not Implemented
ME0264 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,054 $3,010 Not Implemented
ME0264 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $615 $0 Not Implemented