Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0224 # 06 Y:1999 | 06 | 1999 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $50,698 | $22,390 | Implemented |
UF0224 # 07 Y:1999 | 07 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,620 | $2,990 | Not Implemented |
HO0200 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,818 | $7,776 | Implemented |
HO0200 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,223 | $3,065 | Implemented |
HO0200 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $944 | $1,500 | Not Implemented |
HO0200 # 04 Y:1999 | 04 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $451 | $100 | Not Implemented |
HO0200 # 05 Y:1999 | 05 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,395 | $4,800 | Implemented |
HO0200 # 06 Y:1999 | 06 | 1999 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $14,628 | $8,000 | Not Implemented |
HO0200 # 07 Y:1999 | 07 | 1999 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $25,402 | $22,000 | Not Implemented |
HO0200 # 08 Y:1999 | 08 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $10,000 | $35,000 | Not Implemented |
CO0435 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,870 | $14,850 | Not Implemented |
CO0435 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,380 | $2,000 | Implemented |
CO0435 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $570 | $710 | Not Implemented |
CO0435 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $500 | Implemented |
CO0435 # 05 Y:1999 | 05 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $310 | $100 | Implemented |
CO0435 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $210 | $134 | Implemented |
CO0435 # 07 Y:1999 | 07 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $10,920 | $0 | Not Implemented |
CO0435 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,640 | $8,000 | Not Implemented |
ME0264 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,149 | $1,000 | Implemented |
ME0264 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,088 | $2,500 | Not Implemented |
ME0264 # 03 Y:1999 | 03 | 1999 | USE OPTIMUM THICKNESS INSULATION | $3,286 | $613 | Not Implemented |
ME0264 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,025 | $4,646 | Not Implemented |
ME0264 # 05 Y:1999 | 05 | 1999 | CHANGE OPERATING CONDITIONS | $2,720 | $950 | Not Implemented |
ME0264 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,054 | $3,010 | Not Implemented |
ME0264 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $615 | $0 | Not Implemented |