IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0275 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,372 $25,936 Not Implemented
UM0275 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,025 $1,800 Implemented
UM0275 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,898 $500 Implemented
UM0275 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $7,113 $5,492 Not Implemented
UM0275 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,883 $3,000 Implemented
UM0275 # 08 Y:2005 08 2005 AIR CONDITION ONLY SPACE NECESSARY $4,727 $50 Implemented
UM0275 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,909 $1,000 Implemented
SD0356 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $5,391 $11,000 Implemented
SD0356 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,992 $14,000 Implemented
SD0356 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,583 $7,647 Not Implemented
SD0356 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,351 $120 Implemented
SD0356 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,151 $0 Not Implemented
SD0356 # 06 Y:2005 06 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $18,769 $25,650 Not Implemented
SD0356 # 07 Y:2005 07 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,230 $18,500 Not Implemented
WV0308 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,560 $110 Implemented
WV0308 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,364 $3,520 Implemented
WV0308 # 03 Y:2005 03 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,526 $714 Implemented
WV0308 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,098 $382 Not Implemented
WV0308 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,298 $0 Not Implemented
WV0308 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $2,037 $124 Implemented
WV0308 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,350 $72 Implemented
WV0308 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,329 $0 Implemented
WV0308 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $4,132 Implemented
WV0308 # 10 Y:2005 10 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $835 $180 Not Implemented
WV0308 # 11 Y:2005 11 2005 $99,840 $150,768 Not Implemented