IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0061 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $217 $980 Implemented
NC0061 # 06 Y:1995 06 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $64,115 $12,675 Not Implemented
NC0061 # 07 Y:1995 07 1995 REDESIGN PROCESS $12,097 $15,250 Not Implemented
NC0052 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $2,000 Implemented
NC0052 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $403 $100 Implemented
NC0052 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,087 $120 Implemented
NC0052 # 04 Y:1995 04 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,703 $15,000 Not Implemented
NC0052 # 05 Y:1995 05 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $784 $900 Not Implemented
NC0052 # 06 Y:1995 06 1995 KEEP BOILER TUBES CLEAN $8,880 $0 Implemented
NC0052 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,850 $0 Not Implemented
NC0052 # 08 Y:1995 08 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $71,177 $500 Not Implemented
NC0052 # 09 Y:1995 09 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,944 $18,477 Not Implemented
OD0039 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,668 $13,845 Implemented
OD0039 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $3,639 $1,498 Implemented
OD0039 # 03 Y:1995 03 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,565 $5,000 Not Implemented
OD0039 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $225 Implemented
OD0039 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $236 $1,787 Not Implemented
OD0039 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $211 $320 Implemented
OD0039 # 07 Y:1995 07 1995 INSTALL SET-BACK TIMERS $579 $189 Implemented
NC0065 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $360 Implemented
NC0065 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $900 $600 Not Implemented
NC0065 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $205 $380 Not Implemented
NC0065 # 04 Y:1995 04 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,900 $85,000 Not Implemented
NC0065 # 05 Y:1995 05 1995 REDUCE VENTILATION AIR $400 $500 Not Implemented
NC0065 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $512 $260 Implemented