IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0173 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $751 $0 Implemented
MO0173 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,663 $9,284 Implemented
MO0173 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,473 $80 Implemented
MO0173 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,688 $112 Implemented
MO0173 # 08 Y:1996 08 1996 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $267 $120 Implemented
MO0173 # 09 Y:1996 09 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,155 $0 Implemented
MA0365 # 01 Y:1996 01 1996 UPGRADE CONTROLS ON COMPRESSORS $15,805 $20,000 Implemented
MA0365 # 02 Y:1996 02 1996 ELIMINATE/REDUCE AN OPERATION $9,443 $0 Implemented
MA0365 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,539 $840 Implemented
MA0365 # 04 Y:1996 04 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,290 $0 Implemented
MA0365 # 05 Y:1996 05 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $2,173 $876 Implemented
MA0365 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,330 $640 Not Implemented
MA0365 # 07 Y:1996 07 1996 COMBINE UTILITY METERS $420 $0 Implemented
MA0365 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $345 $0 Not Implemented
SD0150 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,102 $21,570 Implemented
SD0150 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,242 $3,920 Implemented
SD0150 # 03 Y:1996 03 1996 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $10,042 $4,160 Implemented
SD0150 # 04 Y:1996 04 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $2,408 $3,077 Implemented
SD0150 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $7,368 $5,825 Not Implemented
SD0150 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $7,565 $3,410 Implemented
SD0150 # 07 Y:1996 07 1996 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $34,791 $5,000 Implemented
IA0138 # 01 Y:1996 01 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,803 $7,955 Implemented
IA0138 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,117 $2,710 Implemented
IA0138 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $1,352 $6,338 Implemented
IA0138 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,468 $2,301 Implemented