IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0084 # 08 Y:1997 08 1997 METER WASTE WATER $2,434 $1,257 n/a
MS0084 # 09 Y:1997 09 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $12,355 $17,000 n/a
ND0271 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,984 $718 Implemented
ND0271 # 02 Y:1997 02 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $462 $200 Implemented
ND0271 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $118 $200 Not Implemented
ND0271 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,804 $420 Implemented
ND0271 # 05 Y:1997 05 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $327 $124 Implemented
ND0271 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $140 $155 Not Implemented
ND0271 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $591 $463 Implemented
ND0271 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $506 $100 Not Implemented
ND0271 # 09 Y:1997 09 1997 USE MORE EFFICIENT ADHESIVE APPLICATORS $381 $360 Implemented
ND0271 # 10 Y:1997 10 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $109 $0 Not Implemented
HO0156 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,285 $20,912 Not Implemented
HO0156 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,204 $800 Not Implemented
HO0156 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,870 $1,550 Not Implemented
HO0156 # 04 Y:1997 04 1997 MOVE PRODUCT USING MECHANICAL MEANS $62,400 $160,000 Not Implemented
HO0156 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,140 $6,500 Not Implemented
HO0156 # 06 Y:1997 06 1997 USE MORE EFFICIENT ADHESIVE APPLICATORS $3,120 $2,000 Not Implemented
HO0156 # 07 Y:1997 07 1997 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $28,080 $500 Implemented
IA0165 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $22,752 $48 Implemented
IA0165 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,823 $3,500 Implemented
IA0165 # 03 Y:1997 03 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,895 $4,200 Not Implemented
IA0165 # 04 Y:1997 04 1997 CONVERT TO ELECTROSTATIC POWDER COATING $3,771 $2,598 Not Implemented
IA0165 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,788 $12 Implemented
IA0165 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,421 $167 Implemented