Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0331 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $3,957 | $2,264 | Implemented |
WV0331 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,906 | $1,560 | Implemented |
WV0331 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,523 | $320 | Implemented |
WV0331 # 07 Y:2006 | 07 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,352 | $1,000 | Implemented |
WV0331 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $778 | $1,460 | Implemented |
WV0331 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $686 | $440 | Implemented |
WV0331 # 10 Y:2006 | 10 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $566 | $1,370 | Not Implemented |
WV0331 # 11 Y:2006 | 11 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $438 | $30 | Not Implemented |
OR0497 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,400 | $3,500 | Not Implemented |
OR0497 # 02 Y:2006 | 02 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $4,200 | $1,800 | Not Implemented |
OR0497 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,550 | $2,550 | Implemented |
OR0497 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,700 | $39,000 | Implemented |
OR0496 # 01 Y:2006 | 01 | 2006 | UPGRADE OBSOLETE EQUIPMENT | $689,000 | $213,000 | Not Implemented |
OR0496 # 02 Y:2006 | 02 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $282,000 | $212,000 | Implemented |
OR0496 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $201,300 | $301,500 | Implemented |
OR0496 # 04 Y:2006 | 04 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $66,800 | $118,000 | Implemented |
OR0496 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $51,400 | $28,000 | Not Implemented |
OR0496 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,700 | $91,000 | Implemented |
OR0496 # 07 Y:2006 | 07 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $8,030 | $2,000 | Not Implemented |
OR0496 # 08 Y:2006 | 08 | 2006 | USE PHOTOCELL CONTROLS | $2,400 | $900 | Implemented |
OR0496 # 09 Y:2006 | 09 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,425 | $0 | Not Implemented |
OR0496 # 10 Y:2006 | 10 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $780 | $295 | Not Implemented |
OR0496 # 11 Y:2006 | 11 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $415 | $600 | Not Implemented |
OR0495 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $249,000 | $15,000 | Not Implemented |
OR0495 # 02 Y:2006 | 02 | 2006 | $379,000 | $168,000 | Not Implemented |