IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

522

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0112 # 08 Y:1995 08 1995 INSTALL TIMERS AND/OR THERMOSTATS $1,306 $849 Implemented
SD0112 # 09 Y:1995 09 1995 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $730 $250 Implemented
SD0112 # 10 Y:1995 10 1995 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,184 $0 Not Implemented
SD0112 # 11 Y:1995 11 1995 USE HIGH QUALITY SCRAP (LOW SULFUR) TO REDUCE HAZARDOUS SLUDGE GENERATION $1,069 $1,000 Implemented
SF0054 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $2,173 $1,215 Implemented
SF0054 # 02 Y:1995 02 1995 REPAIR AND ELIMINATE STEAM LEAKS $2,344 $525 Implemented
SF0054 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $404 $208 Not Implemented
SF0054 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $606 $800 Implemented
SF0053 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,622 $1,540 Implemented
SF0053 # 02 Y:1995 02 1995 REPAIR AND ELIMINATE STEAM LEAKS $384 $150 Implemented
SF0053 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $834 $576 Implemented
SF0053 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $11,243 $19,840 Not Implemented
SF0053 # 05 Y:1995 05 1995 UPGRADE CONTROLS ON COMPRESSORS $18,222 $2,100 Implemented
SF0053 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,019 $28,800 Not Implemented
SF0053 # 07 Y:1995 07 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $243,737 $345,500 Not Implemented
SF0053 # 08 Y:1995 08 1995 OPTIMIZE PLANT POWER FACTOR $2,956 $4,084 Not Implemented
SD0111 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,427 $6,900 Implemented
SD0111 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,270 $1,750 Not Implemented
SD0111 # 03 Y:1995 03 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $633 $0 Implemented
SD0111 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,025 $2,700 Implemented
SD0111 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $1,352 $825 Implemented
SD0111 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $251 $320 Implemented
SD0111 # 07 Y:1995 07 1995 USE PHOTOCELL CONTROLS $1,351 $336 Implemented
SD0111 # 08 Y:1995 08 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $390 $175 Implemented
SF0052 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $390 $1,548 Not Implemented