Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
894
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0501 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,983 | $6,000 | Implemented |
MA0501 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,653 | $46,540 | Implemented |
MA0501 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $5,838 | $9,990 | Implemented |
MA0501 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $4,410 | $2,500 | Implemented |
MA0501 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,219 | $2,162 | Not Implemented |
MA0501 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $736 | $300 | Implemented |
MA0501 # 07 Y:2001 | 07 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $264 | $0 | Implemented |
MA0496 # 01 Y:2001 | 01 | 2001 | RECOVER MECHANICAL ENERGY | $9,000 | $40,000 | Implemented |
MA0496 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,447 | $17,000 | Not Implemented |
MA0496 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,736 | $23,650 | Not Implemented |
MA0496 # 04 Y:2001 | 04 | 2001 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,155 | $50,000 | Not Implemented |
MA0496 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,200 | $0 | Implemented |
MA0496 # 06 Y:2001 | 06 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,090 | $1,100 | Implemented |
MA0496 # 07 Y:2001 | 07 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $846 | $3,000 | Implemented |
MA0496 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $73 | $400 | Implemented |
MA0497 # 01 Y:2001 | 01 | 2001 | COMBINE UTILITY METERS | $38,169 | $79,800 | n/a |
MA0497 # 02 Y:2001 | 02 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $22,000 | $50,000 | Implemented |
MA0497 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,603 | $62,600 | Not Implemented |
MA0497 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,314 | $28,000 | Not Implemented |
MA0497 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,298 | $17,500 | Implemented |
MA0497 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,958 | $13,000 | Not Implemented |
MA0497 # 07 Y:2001 | 07 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,951 | $1,200 | Implemented |
MA0497 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $10,200 | Not Implemented |
MA0497 # 09 Y:2001 | 09 | 2001 | INSULATE BARE EQUIPMENT | $1,884 | $2,000 | Not Implemented |
MA0497 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,424 | $2,000 | Implemented |