IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0316 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $1,512 Implemented
SF0316 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,504 $2,562 Implemented
SF0316 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $1,998 $3,852 Not Implemented
UF0368 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $47,282 $35,000 Not Implemented
UF0368 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,231 $3,846 Implemented
UF0368 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,367 $1,437 Implemented
UF0368 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,437 $1,407 Implemented
UF0368 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $194 $65 Implemented
UF0368 # 06 Y:2005 06 2005 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $340 $316 Implemented
UF0368 # 07 Y:2005 07 2005 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,000 $2,304 Implemented
UF0368 # 08 Y:2005 08 2005 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,656 $5,000 Implemented
OR0493 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $66,200 $1,000 Not Implemented
OR0493 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,900 $1,900 Not Implemented
OR0493 # 03 Y:2005 03 2005 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $5,400 $1,000 Not Implemented
OR0493 # 04 Y:2005 04 2005 USE OPTIMUM TEMPERATURE $11,000 $13,000 Not Implemented
OR0493 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $2,500 Not Implemented
OR0493 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $0 Not Implemented
OR0493 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,400 $3,600 Not Implemented
OR0493 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,900 $17,000 Not Implemented
GT0812 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,393 $3,500 Not Implemented
GT0812 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,363 $8,720 Not Implemented
GT0812 # 01 Y:2005 01 2005 USE SYNTHETIC LUBRICANT $600 $0 Implemented
GT0812 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $20,280 $10,000 Implemented
GT0812 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $469 $400 Not Implemented
GT0812 # 04 Y:2005 04 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $283 $300 Not Implemented