IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0135 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $945 $0 Not Implemented
IC0135 # 09 Y:2007 09 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,210 $4,835 Not Implemented
IC0135 # 10 Y:2007 10 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,755 $0 Not Implemented
IC0135 # 11 Y:2007 11 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $849 $0 Not Implemented
IC0136 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $9,080 Implemented
IC0136 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $2,224 $5,038 Implemented
IC0136 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $5,851 Not Implemented
IC0136 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,389 $3,105 Implemented
IC0136 # 05 Y:2007 05 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,287 $17,000 Not Implemented
IC0136 # 06 Y:2007 06 2007 REDUCE VENTILATION AIR $23,044 $0 Not Implemented
IC0136 # 07 Y:2007 07 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,042 $26,000 Not Implemented
AM0535 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,540 $480 Implemented
AM0535 # 02 Y:2007 02 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,080 $330 Not Implemented
AM0535 # 03 Y:2007 03 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $7,330 $23,975 Not Implemented
AM0535 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $5,840 $24,960 Not Implemented
AM0535 # 05 Y:2007 05 2007 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,570 $760 Implemented
AM0535 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,870 $0 Not Implemented
AM0535 # 07 Y:2007 07 2007 USE SYNTHETIC LUBRICANT $990 $0 Not Implemented
AM0535 # 08 Y:2007 08 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $973 $180 Implemented
UF0406 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,441 $253 Not Implemented
UF0406 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $372 $289 Not Implemented
UF0406 # 03 Y:2007 03 2007 INSTALL SET-BACK TIMERS $6,690 $625 Not Implemented
UF0406 # 04 Y:2007 04 2007 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $6,004 $399 Not Implemented
UF0406 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $17,857 $619 Implemented
UF0406 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,557 $714 Implemented