Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,474
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0029 # 10 Y:1994 | 10 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $207 | $0 | Implemented |
WV0029 # 11 Y:1994 | 11 | 1994 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $227 | $0 | Implemented |
WV0029 # 12 Y:1994 | 12 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $995 | $260 | Implemented |
GT0523 # 01 Y:1994 | 01 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,190 | $6,500 | Not Implemented |
GT0523 # 02 Y:1994 | 02 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,060 | $500 | Implemented |
GT0523 # 03 Y:1994 | 03 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,520 | $40,000 | Implemented |
GT0523 # 04 Y:1994 | 04 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $80 | $100 | Implemented |
GT0523 # 05 Y:1994 | 05 | 1994 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $660 | $2,000 | Not Implemented |
GT0523 # 06 Y:1994 | 06 | 1994 | INCREASE AMOUNT OF CONDENSATE RETURNED | $620 | $1,750 | Not Implemented |
GT0523 # 07 Y:1994 | 07 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $930 | $1,220 | Implemented |
MA0301 # 01 Y:1994 | 01 | 1994 | REDUCE FLUID FLOW RATES | $480,000 | $657,000 | Implemented |
MA0301 # 02 Y:1994 | 02 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,698 | $27,600 | Not Implemented |
MA0301 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,256 | $4,383 | Implemented |
MA0301 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,228 | $0 | Implemented |
MA0301 # 05 Y:1994 | 05 | 1994 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,790 | $1,236 | Not Implemented |
MA0301 # 06 Y:1994 | 06 | 1994 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $1,830 | $5,906 | Not Implemented |
MA0301 # 07 Y:1994 | 07 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,277 | $2,540 | Not Implemented |
UM0001 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,352 | $15,040 | Implemented |
UM0001 # 02 Y:1994 | 02 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,815 | $0 | Implemented |
UM0001 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,040 | $34,841 | Not Implemented |
UM0001 # 04 Y:1994 | 04 | 1994 | ADD AREA LIGHTING SWITCHES | $4,248 | $0 | Implemented |
UM0001 # 05 Y:1994 | 05 | 1994 | OPTIMIZE PLANT POWER FACTOR | $10,300 | $18,603 | Not Implemented |
UM0001 # 06 Y:1994 | 06 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,772 | $1,380 | Not Implemented |
UM0001 # 07 Y:1994 | 07 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,985 | $1,000 | Not Implemented |
UM0001 # 08 Y:1994 | 08 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,932 | $0 | Implemented |