IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0117 # 07 Y:1998 07 1998 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $11,000 $11,000 Not Implemented
UM0117 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $558 $918 Implemented
UM0117 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,896 $9,124 Implemented
UM0117 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $724 $1,000 Implemented
WI0321 # 01 Y:1998 01 1998 CLEAR AND RENT EXISTING SPACE $159,400 $5,292 Implemented
WI0321 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,855 $23,584 Not Implemented
WI0321 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,313 $0 Not Implemented
WI0321 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,118 $15,500 Not Implemented
WI0321 # 05 Y:1998 05 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,197 $200 Not Implemented
WI0321 # 06 Y:1998 06 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $860 $500 Implemented
WI0321 # 07 Y:1998 07 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $680 $2,100 Not Implemented
WI0321 # 08 Y:1998 08 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $588 $0 Not Implemented
SD0199 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $750 Implemented
SD0199 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,572 $4,900 Implemented
SD0199 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,756 $1,182 Implemented
SD0199 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,118 $16,039 Implemented
SD0199 # 05 Y:1998 05 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $17,565 $11,460 Not Implemented
SD0199 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,118 $8,500 Implemented
SD0199 # 07 Y:1998 07 1998 ELIMINATE/REDUCE AN OPERATION $71,300 $0 Not Implemented
SF0139 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,317 $0 Implemented
SF0139 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $182 $0 Implemented
SF0139 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,895 $506 Implemented
SF0139 # 04 Y:1998 04 1998 REPLACE BOILER $22,352 $9,600 Not Implemented
SF0139 # 05 Y:1998 05 1998 REPLACE BOILER $1,885 $1,227 Not Implemented
SF0139 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,855 $1,430 Implemented